Home / Blog / Blog
Blog

Analysis of Profit Structure in Pipeline Fittings Foreign Trade

The profit of pipeline fittings foreign trade cannot be simply understood as the sales price minus the factory manufacturing cost; its complete profit system includes three major positive revenue segments: manufacturing gross profit, certification technology premium, and export tax rebate income, while at the same time it is necessary to deduct various explicit and implicit costs such as cross-border logistics, third-party supervision of manufacturing, documentation and certification, capital occupation, exchange rate fluctuation, and commercial quality risks. This article is oriented toward oil and gas, chemical, and EPC overseas engineering projects, systematically deconstructs the composition of pipeline fittings foreign trade profit, analyzes the impact of material, product standards, order scale, and trade terms on profit, identifies common profit calculation misunderstandings in the quotation process, establishes a fully implemented cost and profit calculation model, and proposes profit preservation and quotation control strategies, providing technical support for profitability assessment and commercial negotiation of pipeline fittings foreign trade projects.

2026-10-28About 16 min read
Analysis of Profit Structure in Pipeline Fittings Foreign Trade
Blog Blog

I. Introduction

Author: Beijing Guojie Pipeline Co., Ltd.

In the field of infrastructure construction such as global oil and gas, chemical, power plants, and marine engineering, pressure pipeline fittings, as core components of pressure-bearing special equipment, have long-term market demand.The domestic pipeline fittings manufacturing industry is mature, and a large number of enterprises have engaged in foreign trade export business and participated in bidding for materials for international EPC general contracting projects.However, a prominent problem commonly exists in foreign trade practice: many enterprises only compare raw material and processing costs during the bidding and quotation stage, rely on simple ex-factory price differences to estimate gross profit, and ignore a large number of hidden costs in the cross-border trade chain. After project execution is completed and accounts are calculated, the actual net profit is far lower than the bid estimate, and there may even be cases of book profit but settlement loss.

Foreign trade in pipeline fittings belongs to B2B cross-border trade in industrial products and is different from the export of ordinary consumer goods. The products have the attributes of special equipment, project technical requirements are complex, and compliance requirements such as technical agreements, third-party supervision, international standard certificates, non-destructive testing, and material traceability systems will significantly change the cost structure.Different materials, pressure ratings, wall thicknesses, applicable standards, order quantities, delivery cycles, and trade terms will all have a decisive impact on project profit.Standard carbon steel fittings rely on large-scale production and export tax rebates to maintain thin profits;Stainless steel, duplex steel, and nickel-based alloy high-pressure pipe fittings command a higher technical premium based on material performance and compliance with international standards;Non-standard custom pipe fittings are produced in small batches, with high fixed cost allocation and greater risk of profit fluctuation.

The root of the cognitive misunderstanding about foreign trade profit lies in equating factory ex-works gross profit with the final net profit of the project.Ex-works gross profit is merely the starting point of the entire foreign trade profit chain. From raw material procurement, production and manufacturing, ex-works inspection, supervision and witnessing, export packaging, domestic trailer and port charges, ocean shipping, and customs clearance at the destination port, to foreign exchange collection and after-sales service during the warranty period, every link in the entire business chain generates costs. Any missed cost calculation will directly erode project profit.

Starting from the overall framework of foreign trade profit, this article breaks down revenue items and cost items by layer, analyzes the key variables affecting profit, sorts out common calculation errors in the quotation and project execution stages, builds a profit evaluation system applicable to the pipeline and pipe fittings industry, and proposes practical strategies for profit preservation and risk hedging, helping pipe fitting foreign trade enterprises establish scientific profit calculation thinking and improve the profitability stability of overseas projects.

II. Overall Framework of Foreign Trade Profit for Pipeline and Pipe Fittings

The final net profit of a pipeline and pipe fittings foreign trade project equals total project revenue minus full-chain landed costs.The complete profit system consists of two major modules: the positive revenue section and the cost deduction section.Positive revenue is divided into three parts: manufacturing gross profit, technical compliance premium, and export tax rebate income;The cost deduction section includes product manufacturing costs, inspection, supervision, and certification costs, domestic export process costs, international logistics insurance and destination port-related charges, capital and financial costs, and various business risk reserves.

During commercial quotation, different trade terms define the cost boundaries of the buyer and seller, directly affecting the profit calculation basis.Under the EXW factory delivery model, the seller only bears the costs of production within the factory and basic factory quality inspection;FOB free on board adds domestic trailer, port miscellaneous charges, customs declaration, and export documents;The CIF price includes the FOB cost plus ocean freight and marine insurance;Under DAP delivery at destination, the seller bears all costs of ocean shipping up to before unloading at the destination port;Under DDP delivered duty paid, the seller bears the entire logistics process and pays the destination country's tariffs and import value-added tax.Many quotation errors occur because different suppliers use inconsistent quotation terminology, and directly comparing unit prices leads to misjudgments of profit.

The particularity of foreign trade in pressure piping fittings is reflected in compliance costs.Exports of ordinary civil industrial products only require a basic certificate of conformity, whereas fittings for oil and gas and chemical EPC projects often mandatorily require international standards such as ASME, PED, and API, EN10204 3.2 third-party witness certificates, 100% non-destructive testing, and material traceability, and some projects also require NACE sour service resistance and low-temperature impact tests.Such compliance requirements increase costs, but at the same time they create technical barriers, and qualified manufacturers can obtain product premiums, which is a source of profit that does not exist in ordinary domestic orders.

Profit calculation needs to adhere to the Landed Cost mindset, taking the delivery of goods to the overseas project site warehouse as the accounting endpoint and incorporating all incurred expenditures into the calculation, rather than only calculating factory production costs.

III. Itemized Analysis of Positive Returns in Foreign Trade Projects

3.1 Manufacturing Gross Profit: The Underlying Source of Profit

Manufacturing gross profit = export ex-factory value of the product - manufacturing cost of the product.Manufacturing costs include raw materials, processing and forming, heat treatment, in-house factory quality inspection, mold amortization, and plant and equipment management overhead allocation.Raw materials account for the highest proportion of manufacturing costs; for carbon steel pipe fittings, raw material costs account for 65% to 75% of manufacturing costs;The proportion for 304 and 316L stainless steel rises further;For special alloys such as duplex steel, Hastelloy, and Inconel, raw material prices are high, and raw materials can account for more than 80% of manufacturing costs.

Raw material prices fluctuate with international commodity markets, and the prices of alloying elements such as nickel, molybdenum, and chromium rise and fall cyclically; for long-cycle EPC projects, rising raw material prices directly squeeze manufacturing gross margins.Different types of pipe fitting products involve vastly different processing hours: elbows, tees, and reducers have complex forming processes;Large-diameter, thick-walled, high-pressure flanges require forging and multiple machining operations, so their processing costs are higher than those of ordinary butt-welded pipe fittings.Molds for standard pipe fittings are mature, and with large-volume production, the mold amortization per unit is low;Non-standard custom pipe fittings require new molds; with small order quantities, the per-unit mold amortization cost is significantly increased.

For thick-walled, high-pressure, large-diameter pipe fittings, forming is difficult and heat treatment process control is stringent, increasing heat treatment energy consumption and sample testing costs, which in turn drives up manufacturing costs.Heat treatment is a key process for pressure-bearing pipe fittings. Thick-walled carbon steel and alloy steel fittings require annealing and normalizing to eliminate residual forming stresses. Heat treatment curves must be retained on file and incorporated into the material certificate, increasing management costs.Large-volume orders can be heat-treated in full furnace loads, resulting in low unit costs;small batches are loaded into the furnace separately, so the fixed furnace cost is spread over a small number of products, sharply increasing the per-unit heat treatment cost.

In-house factory quality inspection includes dimensional inspection, visual inspection, mechanical specimen testing, and spectral PMI testing.Under mass production conditions, quality inspection labor and equipment depreciation are diluted, keeping per-unit costs controllable;for scattered small orders, quality inspection preparation work is fixed, so the per-unit quality inspection amortized cost is relatively high.Factory building depreciation, equipment maintenance, salaries of production management personnel, and water and electricity consumption are allocated into the per-unit cost as manufacturing overhead expenses.The larger the order scale, the lower the per-unit allocated management cost.

3.2 Technology and compliance premium: the core profit growth point of high-end projects

The technology premium is the core source of revenue that distinguishes foreign trade in pipeline fittings from ordinary bulk commodity exports.When overseas owners or EPC general contractors put forward technical requirements higher than conventional standards, the supplier can obtain a compliance premium by meeting the specification requirements.The premium mainly comes from three dimensions: standard qualifications, inspection levels, and material grades.

First, the international standard qualification premium.Products that meet ASME B16.5, ASME B16.9, PED pressure equipment CE certification, and API petroleum fittings specifications can enter the high-end project markets of oil and gas and chemical industries;Enterprises that can only produce national-standard pipe fittings can only participate in low-end, low-price competition.Certification itself involves type testing, system audits, and annual surveillance fees; the larger the order, the lower the certification cost allocated per unit.Possessing a full set of international system qualifications is the entry ticket to overseas high-end EPC projects and at the same time brings a stable premium.

Second, the inspection grade premium.Ordinary projects only require the manufacturer to issue an EN10204 3.1 certificate and perform sampling non-destructive testing;For high-risk working condition projects, owners require EN10204 3.2 third-party witnessed certificates, 100% UT/MT/PT/RT non-destructive testing, low-temperature impact tests, and intergranular corrosion tests.Third-party TPI agencies (SGS, BV, TÜV) are stationed at the factory for supervision and charge supervision fees per person-day; although costs rise, the product's market competitiveness is enhanced and a significant premium can be obtained.Many low-price bidding schemes deliberately lower the inspection grade, fail the owner's review later, and require supplementary inspections and reissued certificates, which instead generates higher rework costs.

Third, the premium on special materials.Carbon steel A234 WPB and A105 flanges are general-purpose products with sufficient market competition and limited room for premium pricing;304 and 316L stainless steel carry a certain premium;For special alloy pipe fittings such as duplex steel, Hastelloy, and Inconel, raw material procurement channels are few, processing is difficult, and welding, heat treatment, and inspection processes are strictly controlled, giving the largest room for technical premiums; these are also the high-profit categories in foreign trade pipe fittings.

Non-standard custom pipe fittings likewise carry premium attributes.Designed and produced separately according to project drawings, the fixed costs of molds, process qualification, and documentation preparation make the per-unit cost high for small-batch orders, but there are few market competitors, so a customization premium can be charged.

3.3 Export tax rebate income: enhancing overall profit

Export tax rebates are an important component of income for domestic pipe fitting foreign trade enterprises. The state has established rebate policies for steel export products; after enterprises complete customs declaration for export and receive foreign exchange, they apply for rebates with the customs declaration form and VAT invoices.The export tax rebate rates for carbon steel pipe fittings and stainless steel pipe fittings directly affect the overall profitability of a project.Many companies treat the tax rebate as part of their profit when quoting prices. In price competition, they can rely on the rebate to moderately lower their quotes and win orders.

Tax rebate income involves a time cost.There is a period of several months from customs declaration and export of the goods to the rebate funds arriving in the account. Companies advance funds in the early stage to purchase raw materials and organize production, and the capital occupation generates interest. This financial cost must be included at the quotation stage.Tax rebate policies carry the risk of change, and long-term projects need to assess the possibility of policy adjustments.The tax rebate is not a permanent fixed income and cannot be treated as stable gross profit. Once there are document defects or delays in foreign exchange collection, the rebate processing is hindered, directly causing a loss of income.

IV. Itemized Analysis of Various Deductible Costs in Foreign Trade Projects

4.1 Costs of Inspection, Supervision, and Certificate Documentation

Inspection and supervision is a cost item unique to foreign trade in special equipment, and it is easily simplified and overlooked by quotation personnel.Non-destructive testing NDT includes UT ultrasonic testing, MT magnetic particle testing, PT penetrant testing, and RT radiographic testing.Sampling inspection has a low cost;for 100% full-range flaw detection, the costs of labor, equipment, and film increase exponentially.Alloy and low-temperature pipe fittings also require impact tests and intergranular corrosion tests, which are sent separately to third-party laboratories for testing, generating sample preparation and testing fees; testing personnel must hold ASME qualifications, so labor costs are higher.

Third-party inspection TPI fees are charged per person-day; the more hold points and witness items there are, the higher the supervision fee.The EN10204 3.2 certificate must be witnessed and signed by a third-party organization; compared with the 3.1 certificate issued by the manufacturer itself, this generates an additional independent supervision fee.

The cost of preparing quality documentation is likewise not to be ignored.Documents for foreign trade projects such as MTC material certificates, heat number traceability sheets, heat treatment curves, NDT reports, dimensional records, and certificates of origin are required in English versions, with strict format, signatures, and stamps.Repeated proofreading and revision of documents generate labor costs;Once documents contain errors or certificates become invalid, re-production is required, generating additional costs.Some countries in the Middle East and South America also require embassy consular authentication, and the authentication fees are relatively high.

4.2 Domestic export-stage costs

The domestic export stage refers to all expenses from the time goods leave the factory until they are loaded onto an ocean-going vessel.The packaging standards for foreign trade pipe fittings are much higher than those for domestic orders; plastic protective caps are added to the beveled ends of elbows and flanges;Stainless steel pipe fittings use isolation pads to prevent iron contamination from contact with carbon steel;Heavy-duty large-diameter pipe fittings are packed on fumigated wooden pallets or fumigation-free pallets. Wooden packaging requires a fumigation mark, and packaging materials, shipping mark spraying, and securing and strapping all incur costs.For large-diameter heavy-duty pipe fittings, the packaging cost per unit accounts for a higher proportion.

Inland trucking, lifting and loading/unloading, and port storage fees; if the order is shipped in batches, multiple trucking trips are required, increasing transportation costs.If the goods arrive at the port ahead of time, storage and custody fees are incurred.Port THC (terminal handling charges), security fees, and container lifting fees are billed according to container type.If customs randomly selects the shipment for inspection, relocation, lifting, and inspection service fees will be incurred, which are uncertain costs.Customs declaration agency fees, commodity inspection service fees, and handling fees for certificates of origin and various documents all constitute domestic export costs.

4.3 International logistics, insurance, and destination port taxes and fees

Under FOB terms, the ocean freight and insurance costs are borne by the buyer;Under CIF, DAP, and DDP modes, the exporter needs to calculate them.Pipe fittings have irregular shapes and are mostly heavy cargo, so freight is charged based on the greater of weight and volume.Large-diameter flanges and thick-walled pipe fittings may require open-top containers or flat racks, and the freight is much higher than that of ordinary containers.Ocean freight prices fluctuate sharply with market peak seasons and the degree of space tightness, and long-cycle projects are prone to encountering significant increases in ocean freight.Shipping in batches requires multiple bookings, repeatedly generating document and handling fees.

Marine insurance generally covers all risks at 110% of the cargo value, with the premium calculated as a proportion of the cargo value, covering the risk of damage and loss at sea.After the cargo arrives at the destination port, there are terminal document exchange fees, THC, customs clearance agency fees, lifting, and short-haul transport to the project warehouse.Inconsistent customs clearance documents and disputes over HS code classification can cause goods to be stranded at the port, incurring high container demurrage and storage fees.

Destination country tariffs, import VAT, and anti-dumping duties vary greatly from country to country.The EU CBAM carbon tariff adds new carbon costs for steel products.Under the DDP model, tariffs and VAT are estimated by the exporter and included in the quotation;Under the FOB/CIF model, taxes and fees are borne by the overseas buyer, but when the purchaser evaluates the landed cost, they must still be included in the overall project investment.

4.4 Capital, exchange rate, and hidden risk costs

Hidden costs are the part most easily overlooked in profit calculations; although they are not directly reflected in the product unit price, they can significantly erode net profit.Foreign trade order cycles are long: from contract signing, raw material procurement, manufacturing, shipping, overseas acceptance, to final payment collection, they often span several months or even cross years.The enterprise advances funds to procure raw materials and organize production, tying up working capital and incurring financing interest.Settlement by usance letter of credit involves discount interest.The longer the order cycle, the higher the cost of capital occupation.

Foreign exchange settlement mostly uses US dollars and euros, and there is a time gap between contract signing and receipt of foreign exchange, so exchange rate fluctuations bring about exchange gains and losses.For large-scale, long-cycle pipe fitting projects, the risk of exchange rate fluctuations is enormous.Bank-related fees include letter of credit issuance fees, notification fees, negotiation fees, cable charges, and foreign exchange settlement handling fees;If discrepancies in documents occur under the letter of credit, deductions will be incurred.

Engineering change supplementary costs: design changes in overseas EPC projects, modification of pipe fitting specifications, materials, and inspection standards may cause products already put into production to be scrapped, requiring re-procurement of raw materials for production.Supplementary orders have small batch sizes and high fixed cost allocation, so the cost of supplementary parts is far higher than that of the main order.Quality rework and claim reserve funds: missed inspections before leaving the factory, damage from bumps during transportation, and failure of on-site re-inspection generate repair, return and exchange, and secondary transportation costs;Supply delays causing the owner to stop work will result in liquidated damages claims.At the quotation stage, a risk reserve should be set aside, and the reserve ratio should be determined according to working conditions and project risk level; the reserve ratio should be increased for high-pressure alloy and overseas high-risk projects.For urgent expedited orders, customers require compressed production cycles, and factories work overtime and prioritize scheduling, generating expediting premiums and raising costs.

V. Key Factors Affecting the Profit of Foreign Trade Pipe Fittings

Material grade is the first factor affecting profit; ordinary carbon steel products face fierce competition and have thin gross margins;Stainless steel has a certain profit margin;Special alloy pipe fittings such as duplex steel and nickel-based alloys have scarce raw materials and complex processes, and offer the highest profit ceiling.

Executive standards, pressure classes, and wall thicknesses differ: ASME American standards, DIN German standards, and national standard pipe fittings have different requirements for billets, processing, and inspection.For Class high-pressure-rated pipe fittings, forged billets are larger; the higher the SCH wall thickness grade, the more material is consumed and the higher the cost.Compared with standard SCH pipe fittings, non-standard thickened pipe fittings consume significantly more raw materials and cost more.

The grade of inspection certificates determines compliance costs and premiums.With only the manufacturer's 3.1 certificate and sampling NDT, the cost is the lowest;EN10204 3.2 third-party witness, 100% non-destructive testing, impact corrosion testing, and PED certification—each additional item increases costs while also bringing a premium.Many price comparison mistakes come from directly comparing quotations with different inspection scopes.

Procurement batch size and delivery lead time: for large-volume orders, raw materials are centrally purchased, and the fixed costs of molds, third-party inspection, and certificates are spread over more units, reducing the per-unit cost;For small, scattered orders, raw materials are subject to minimum heat-number restrictions, and the fixed costs of molds and inspection certificates are allocated across a small number of products, causing the per-unit cost to rise significantly.Urgent orders with short delivery lead times incur an expediting premium.

Trade terms and delivery locations—EXW, FOB, CIF, DAP, DDP—have completely different cost boundaries, so price comparisons must use a unified basis.

VI. Common Misconceptions in Foreign Trade Profit Calculation

Misconception 1: Comparing only ex-factory unit prices while ignoring differences in inspection, certificates, and third-party inspection.Two quotations may have similar surface unit prices—one with a 3.1 certificate and sampling inspection, the other meeting the owner's requirements for a 3.2 certificate plus 100% RT—but their costs are not on the same basis; comparing prices alone will later fail to meet the project's technical requirements.

Misconception 2: Assuming that large-volume procurement will necessarily reduce the price of every single item.Raw material and processing costs decrease with batch size, but multiple partial shipments, multiple supervision sessions, and multiple certificate issuances cause fixed costs to recur, offsetting the benefits of scale-based price reductions.

Misconception 3: Underestimating capital interest, exchange rate, and port detention risks.The budget only accounts for direct physical logistics costs and does not set aside reserves for capital occupation, container detention and port demurrage, or exchange losses. Once ocean shipping is delayed or customs clearance is blocked, additional expenditures break through the budget.

Misconception 4: Confusing trade terms by equating FOB quotations with DAP landed costs.FOB only covers up to the port of departure and does not include ocean freight, insurance, or destination port taxes and fees. Using it directly as the on-site delivered cost underestimates the overall investment.

Misconception 5: Ignoring the cost increase of change and supplementary orders.The main order has a low unit price due to large volume, while later small supplementary orders of pipe fittings are small-batch production with fixed costs allocated across fewer units, so the unit price of supplementary items is far higher than that of the main order. The earlier budget did not reserve funds for supplements, resulting in overspending.

VII. Strategies for Preserving Profit and Controlling Quotations in Foreign Trade of Pipes and Pipe Fittings

First, technical specifications should be fixed in advance to reduce later engineering changes.Before signing the contract, complete tripartite confirmation of drawings, standards, pressure ratings, wall thickness, inspection items, and certificate requirements to achieve technical freeze.Establish a change review process: for any drawing modification, recalculate costs and delivery schedules, assess the impact of the change on profit, sign a change supplement agreement, and confirm the supplementary price, so as to avoid profit loss caused by uncompensated changes.

Second, optimize procurement batch sizes and shipment batches.Merge products of the same specification, expand the single procurement batch size, and dilute fixed costs for molds, supervision, and certificates;Reasonably plan batch shipment schedules to reduce duplicate costs from multiple bookings and multiple supervision sessions, and balance inventory capital occupation with the production delivery rhythm.

Third, match inspection certificate grades on demand and eliminate excessive inspection.Determine the inspection plan strictly according to the project's operating conditions; for ordinary operating conditions, select a reasonable inspection plan, and do not blindly choose high-specification requirements such as 3.2 certificates and 100% full inspection, so as to avoid unnecessary cost input;For high-pressure, corrosive, and high-risk pressure-bearing operating conditions, mandatory witness inspection shall be strictly implemented in accordance with specifications to avoid huge claims caused by quality accidents.

Fourth, hedging against raw material price risks.For long-cycle large-value alloy pipe fitting orders, a raw material price adjustment formula shall be set in the contract, anchored to benchmark prices of steel and nickel, with agreed upward and downward thresholds, so as to jointly share the risk of commodity price increases;Lock in steel mill billet production scheduling in advance to avoid raw material price increases eroding gross profit.

Fifth, implement itemized quotation review and establish a practical cost calculation template.For bid quotations, suppliers shall be required to provide itemized detailed quotations, with raw materials, heat treatment, NDT, supervision, certificates, and packaging costs checked item by item, and a standardized practical cost calculation table shall be built to unify the price comparison basis and distinguish manufacturing gross profit from the project's final net profit.

Sixth, improve contract commercial terms and control risk costs.The contract shall clearly define liability for delays, liability for quality defects, and liability for document discrepancies;Agree on the pricing rules for engineering changes;Review letter of credit terms in advance to reduce the risk of deductions due to document discrepancies.Standardize packaging, shipping marks, and HS codes, and confirm destination country customs clearance requirements in advance to reduce customs inspections and cargo detention, and avoid extra costs from port and container demurrage.Lock in shipping space in advance during the peak sea freight season to avoid temporary surges in ocean freight rates.

Seventh, establish a full-project-cycle profit tracking mechanism.After winning the bid, establish a dynamic cost ledger to track cost changes throughout the entire process of raw material procurement, production, supervision of manufacturing, shipment, and foreign exchange collection. Once costs rise abnormally, issue timely warnings and take countermeasures to prevent continuous erosion of project profits.

VIII. Conclusion

The profit of the pipe and pipe fittings foreign trade business is a multidimensional comprehensive system, and project profitability cannot be judged simply by the ex-factory price difference.Total profit includes manufacturing gross margin, technical compliance premium, and export tax rebate income;deducting explicit and hidden costs such as manufacturing costs, inspection, supervision and certification, export logistics, capital interest, exchange rate fluctuations, and quality claims.Material grade, product standards, inspection certificates, order batch size, and trade terms are the five core factors affecting profit.

Currently, competition in the international EPC project market is becoming increasingly fierce, low-price bidding is common, and many enterprises lack the ability to calculate full-chain landed costs, underestimate hidden costs, and continuously erode profits during the project execution stage.Foreign trade pipe fitting enterprises need to abandon the traditional mindset of only calculating factory gross profit, establish a landed cost calculation model, fully assess all costs and risks during the bidding and quotation stage, and properly hedge risks related to raw material prices, exchange rates, and engineering changes.

Profit control runs through the entire project life cycle, including inquiry and quotation, contract signing, production and manufacturing, supervision and shipment, and foreign exchange collection and warranty.By reducing changes through technical freezing, reasonably planning order batch sizes, matching inspection levels as needed, and improving commercial risk clauses, it is possible to stabilize project profitability, protect profits in foreign trade projects, and promote high-quality and sustainable development of the foreign trade business in pipes and pipe fittings.

References

[1] Li Xuedao. Practical Guide to Foreign Trade Procurement and Cost Control of Pressure Piping Components [M]. Beijing: China Machine Press, 2023.

[2] Wu Baifu. Practical Course on Import and Export Trade [M]. Shanghai: Shanghai People's Publishing House, 2022.

[3] GB/T12459-2017, Steel Butt-Welding Seamless Pipe Fittings [S].

[4] ASME B16.9, Factory-Made Wrought Butt-Welding Fittings [S].

[5] ASME B16.5, Pipe Flanges and Flanged Fittings [S].

[6] Zhang Lei. Research on Landed Cost and Profit Calculation of Material Procurement in International EPC Projects [J]. Petroleum Engineering Construction, 2024.

Analysis of Profit Structure in Pipeline Fittings Foreign Trade